Loop-the-loop Tinplate Layout (under construction)

The goal of this 4x8 foot layout is to create a home for prewar tinplate O gauge trains. The switches can set thrown to run two trains independently, one on the outer loop and the other on the inner figure-8, or to run one train on a long twisting run which includes the left half of the outer loop as well as the inner track.

Basic Loop-the-Loop

Loop-the-Loop with Siding

Loop-the-Loop with Siding and Double Reversing Loops


Back to Layouts